The settlement agreement is for the four allegations made by the US Environmental Protection Agency in 2004 regarding DuPont’s violation of the Toxic Substance Control Act and the Resource Protection Act. Mr. Ma Bole, senior vice president and global chief legal adviser of DuPont, said: 'We have different understandings with the EPD on the relevant technical reporting procedures. The settlement agreement allows us to cross over these and focus on the future. DuPont has reduced the emissions of perfluorooctanoic acid (PFOA) and its salts (PFOA) in its US facility by 98%, and is working to reduce it by 99% in 2007. '
DuPont also stated that research conducted by the company and independent scientific research personnel have confirmed that bedding and other consumer products made from DuPont materials or using DuPont's raw materials are safe for consumers. .
It is understood that DuPont will pay $10.25 million as a fine and another $6.25 million for two additional environmental protection projects related to the settlement agreement.
The US Environmental Protection Agency said it will continue to assess the risk of PFOA and PFOA to determine if there are any issues that need to be responded to in the regulatory context.
Procedure
Casting ,Die Casting, forging, stamping, machining, injection
We supply big range of such Pump & Valve parts
B. Main particulars
|
MAIN PARTICULARS |
Material |
Carbon steel(20#-60#, S235-S355-), Alloy steel(4140,4340,42CrMo, -), Powder metal, stainless steel, aluminum alloy, zinc alloy, brass, gray iron, cast iron, ductile Iron or other specified |
Standard |
ASTM, ASME, DIN, JIS, ISO, BS, API, EN |
Certificate |
ISO9001 |
Tolerance |
Up to +/- 0.002mm |
Dimension |
As per drawing, as large as we can |
Processing |
CNC turning, CNC turning and milling compound processing, 3/4/5 axis CNC machining center, wire-cutting, EDM, grinding etc. |
Finishing surface |
Machined surface with oil, blasting and painting, anodize, polishing, powder painting, electrophoretic coating- |
Marking |
as per clients` requirements |
Inspection |
material, construction, dimension, heat treatment, hardness, NDT |
Quality |
ISO9001, PPAP control production |
Lead time |
3-20 days for sample, consult with customer for mass production |
Delivery |
Express for sample, ocean shipping/air for mass production |
Our Capabilities |
CNC machining, CNC center machining, drilling, milling, turning, grinding, tapping, boring |
Engineering & manufacturing services |
R&D process, tooling and gauging design, product design Integrated CAD/CAM system, test and measuring |
Others |
Recyclable, in line with environmental requirements and standards, and reliable |
C. Construction
Construction by casting, forging, stamping, injection and machining
D Workmanship
The workmanship have good production practice. Care are taken to ensure High accuracy and smooth surfaces
E. Certificates
- Material certificates
- Measuring reports
- Inspection protocol
- NDT reports
- Fixed certificate: ISO9001 certificate
Our service
Besides above the general specifications, we can also supply some specific machining parts as clients' requirements.
Package and shipping
Export cartons, pallets, wooden cases, Polybags
container package and container transportation
Pump And Valve Parts,Pipe Steel Fittings,Aluminum Pipe Fittings,Hydraulic Press Components
Shinvast Industry Ltd , https://www.shinvastindustry.com