
China Drying Network News Tianji Group newly builds an annual output of 250,000 tons of ammonium nitrate calcium conversion project and will start normal production on July 26. This marks the completion and production of the first major coal chemical transformation project in the “Twelfth Five-Year Plan†of Shanxi Province. The successful operation of the project has greatly improved the conversion rate of coal chemical industry in Shanxi, which is based on coal. The economic and social benefits are very prominent.
The ammonium nitrate calcium nitrate project is one of the key coal chemical transformation projects identified in the “Twelfth Five-Year Plan†of Shanxi Province, and is also the first project of Tianji Group to build a characteristic coal chemical industry park. As one of the modified products of ammonium nitrate, calcium ammonium nitrate is a new type of nitro-efficient compound fertilizer containing nitrogen and available calcium. Prior to this, there was no domestic scale calcium ammonium nitrate production facility.
With the ammonium nitrate calcium project smoothly entering the normal production stage, the new project to build an annual output of 130,000 tons of aniline in Tianji is also trying to stop the tailrace test. It is understood that the two major new-build transition projects have invested a total of 560 million yuan. After the project is completed, it will increase the industrial output value of the company by more than 2 billion yuan and achieve a profit of more than 300 million yuan. At the same time, the project has an annual output of 300,000 tons of synthetic ammonia, 270,000 tons of nitric acid annually, 70,000 tons of adipic acid and 500,000 tons of nitro-complex fertilizer project under construction, with the world's advanced coal gasification technology and new technology and Shanxi The integration of coal resources will provide an effective path for Shanxi to vigorously implement the new coal chemical strategy.
Walking Pile Drilling Machinery
Pile driver for construction site,the features showing as below:
1.Excellent performance, fast lifting, large lifting weight.
4.The hole wall drilled by pile drilling has good stability, complete hole cleaning after hole completion and fast construction progress.
2.Ensure that all indexes of pile foundation verticality, hole position, hole depth and sedimentation thickness meet the requirements of construction specifications.
3.The unique sealing structure design of the power head can effectively prevent the cement slurry from entering the reducer case and prolong the service life of the power head.
5.Having high cost performance, wide application scope and high social and economic benefits;
6.The Caterpillar Pile Drilling Machinery characteristic of stabilization, credibility, speediness and high capability which makes the Pile Drilling is favored.
Walking Pile Drilling Machinery,Construction Equipment Pile Driver,Hydraulic Hammer Pile Driver,Highway Guardrail Pile Driver
Fangyuan Group Co.,Ltd. , https://www.fygcorp.com