On February 17, Zhenhua Heavy Industry Nantong Transmission completed the production of 4 sets of 12,000 ton cranes and successfully delivered them. The production and testing process was all approved by American ABS. A 12,000-ton crane ship is equipped with 10 sets of anchoring machines, and the remaining 6 sets of anchoring machines are also in the assembly.
Crimped Wire Mesh,Crimped Mesh,Crimped Wire Cloth,Crimped Wire Screen
ANPING HANKE FILTER TECHNOLOGY CO , https://www.anpinghankefilter.com