2. Top quality and best competitive price
3. High rubber content and good inner structure
4. Tyres normally can run more 18000-20000kms on china road
5. Use auto feed machine, make tubes according to Japan Standard JIS K6367
6. ISO9001, CCC, SONCAP, etc.
7. Prompt delivery time
8. Good aftersales service
We produce many kinds of bicycle tyres and tubes including natural tube and butyl tube with A/V, E/V, F/V, L/V, G/V, C/V, D/V, TR4 etc
SPECIFICATIONS OF BICYCLE TIRES AND TUBES
12*2.125 bicycle tyre
12X2.125 12X1.95 12X1.75 12X1.4 12 1/2x2 1/4
14X2.125 14X. 195 14X1.75 14X1.4
16X2.125 16X1.95 16X1.75 16X1.4
18X2.125 18X1.95 18X1.75 18X1.4
20X2.125 20X1.95 20X1.75 20X1.4
22X2.125 22X1.95 22X1.75 22X1.4
24X2.125 24X1.95 24X1.75 24X1.50 24X1 3/4 37-533
26X2.125 26X1.95 26X1.75 26X1.50 26X1 3/8
28X2.125 28X1.95 28X1.75 28X1 1/2 400-622 47-622.
What is suspended platform ZLP?
ZLP suspended platform conforms to the standard GB/T 19155-2017, EN1808:2015, EN60204-1:2018, ENISO12100:2010.
It is ideal equipment for building facade construction, decoration, cleaning and maintenance. And it is also widely used in facade building, glass cleaning and installing, elevator installing, ship building and repairing, or in other works such as big-size tank, bridge, embankment and chimney.
It is easy for operation, flexible for moving, reliable in safety. Besides, it is not necessary to build scaffolding in the construction, the efficiency will be promoted and the cost will be reduced. Therefore, it provides workers safer, easier and more efficient platform access.
ZLP series Temporarily installed suspended platform (ZLP630/ZLP800 TSP) developed and produced by SHENXI Group is an electric climbing type decoration machine, which is mainly applied to the external wall construction, decoration, cleaning and maintenance of high-rise and multi-storey buildings. It can also be applied to elevator installation, large tanks, bridges, dams and other engineering operations. Model name ZLP630 or ZLP800 refers to their rated capacity.
Application
![]() |
![]() |
![]() |
![]() |
How to Install Shenxi ZLP630 Suspended Platform?
This video could help and guide you to understand the whole process of temporay suspended platform installation, including:
1. Chek up the number of parts and separte the parts for Suspension Mechanism and working platform (0:10~0:27)
2. Suspension mechanism and counter weight installation (0:28~6:46)
3. Working platform installation (6:47~8:19)
4. Hoist, Safety Lock and control box installation (8:20~10:14)
5. Put through the lifting wire rope and heavy hammer (10:15~12:05)
6. Wire roller installation (12:05~12:32)
7. Operation and check after power-on (12:33~14:33)
Suspended Platform,Suspended Stage Platform,High Aerial Working Platform,Suspended Working Platform
Shenxi Machinery , https://www.cn-shenxi.com