Comment: Wind Power Industry "Carefully"

"If you want to completely fulfill our government before last year's Copenhagen conference on the international community to non-fossil fuels in primary energy consumption of 15% of commitment, wind power should reach 300 billion kwh, the wind power installed capacity will reach 150 million -2 million kilowatts, Therefore, in 2015 , it will reach 90 million kilowatts. In the next ten years, an average annual increase of 12 million kilowatts of installed capacity will be appropriate. ” At the recent development of the new energy industry base and CEO of the multinational corporation Zhang Bei Forum, China’s renewable energy society The committee’s vice chairman Shi Pengfei said.

In April this year, China's offshore wind power concession bidding project was launched. The industry is widespread concern at onshore wind power equipment manufacturing "excess capacity" phenomenon still persists background, offshore wind power project will start or wind power equipment industry has brought another round of investment boom.

Zhou Fengqi, former director of the Energy Research Institute of the National Development and Reform Commission, emphasized that offshore wind energy technology needs further development. Although the quality of offshore wind energy onshore wind may be better than 50%, but the current building offshore wind investment costs may reach 2 times the land is expected to cost in 2050 will decline by 38%. According to the analysis of the International Energy Agency, offshore wind power generation equipment has many differences in terms of performance, safety and stability due to ocean currents, geology and corrosion, but Zhou Fengqi bluntly stated: “The domestic offshore wind power equipment is just land Upper wind turbine ' oceanization ' . "

Zhou Yuanbing, deputy chief engineer of Guodian Energy Research Institute, said that the current difficulties in grid connection of wind power have not yet been solved. This is due to the lack of a unified plan for wind power development. Wind power development planning is not compatible with power grid planning; there is overall lag in power grid construction. The phenomenon of power supply construction, especially the " Three North " and other wind power development areas are at the end of the power grid, the power grid structure is relatively weak, and the cross-regional power grid interconnection scale is small, which restricts the large-scale distribution and absorption of wind power.

“ On the other hand, grid connection is not a problem set by the grid companies and grid companies. It is not as simple as it appears on the surface, but it is due to the difficulties and challenges arising from factors such as the level of technology, development speed, and the constraints of existing objective conditions. . "he said.

Zhou Fengqi believes that since offshore wind power equipment manufacturing technology is not mature at present, if it is too late to make enough technical preparations, it must start large-scale promotion, and it will be difficult to solve problems after they arise. Therefore, to handle the " fast " and " good " issues, we must make full technical preparations and should be the focus of our first concern.

EVA Faux Teak Sheet

EVA Faux Teak Sheet comes in double layers EVA material, it appears grooves to show the bottom color after the roller cutting, which makes it looks like a teak wood. So instead of using a real wood for the boat flooring, more and more people put their focus on this no maintain and Eco-friendly EVA marine sheet.

EVA Faux Teak Sheet

Made from marine grade UV resistant, closed cell, high density EVA foam material, it stands perfectly even in a strong sunlight area. And the EVA foam material makes it softer and more comfortable for people standing there bare feet than real teak or PVC teak. Some would concerned if the boat mat would be not durable to use since it is made from foam material. Well, it may not hard like real teak or PVC teak, and compete the durability with those two, but with a higher density EVA foam, we are able to compete with other suppliers who try to compromise the density to reach to a lower price.


The sheet comes in 230cm x 90cm or 250cm x 120cm, user can cut the sheets into size to fit the shape of boat decking, then just peel and stick since the sheets we offer is with 3M adhesive on the backing. It can be applied on boat decking of course, and other like swim platform pad, helm station pad or simple seat pad.

EVA Faux Teak Sheet

What's more, this kind of sheets can be applied in recreation vehicle for luxury flooring, a safe traction mat for the edge of swimming pool, a beautiful looking for flooring in room or balcony.

Eva Faux Teak Sheet,Faux Teak Sheet,Foam Faux Teak Sheet,Faux Teak Strip,Faux Teak Edging,Eva Faux Teak Deck Sheet

Huizhou City Melors Plastic Products Co., Limited , https://www.melorsfloor.com